Preparation of Uncoated Surfaces for Semi-Transparent Concrete Stain

A great looking finish begins with the right start. Following the proper prep procedures will dramatically affect the look and longevity of your finished project.

最佳效果:

Make sure that new concrete has cured for 30 days prior to applying any floor treatment.

For your safety, please wear protective clothing, eye goggles and acid-resistant rubber gloves and footwear.

How to Clean and Etch a Concrete Surface

  1. Step 1

    The surface must be clean before you start. Wipe off any excess oil and grease spills. Scrape and sweep away any dirt or loose contaminants from the surface. 

    Ensure no sealer or coating is present. Sprinkle a few drops of water onto the surface.  If water is quickly absorbed, the surface is ready. If water does not absorb, a sealer could be present and needs to be removed.

  2. Step 2

    Once the surface is clean, apply the cleaner & etcher product. Use a plastic watering can to evenly distribute the product.

  3. Step 3

    Spread the cleaner and etcher using a stiff bristled, non-metal brush or broom. Allow the product to stand on the surface for at least 10-20 minutes, then scrub vigorously with the broom again.

  4. Step 4

    Ensure the cleaner and etcher do not dry on the surface.  Lightly mist the surface with water, if needed, to keep it wet. Heavily stained areas, older stains, or dense, smooth finishes may require additional applications.

  5. Step 5

    Thoroughly rinse the surface with a garden hose with a high pressure nozzle or a pressure washer. Prevent the rinse solution from entering the storm drains.

  6. Step 6

    The surface is ready for priming when it feels like medium grit sandpaper and no residue or loose concrete remains. To avoid adhesion issues, ensure the surface is clean by wiping your fingers over the surface to check for dust or powder. If residue is present, repeat the rinsing step.

How to Prime a Concrete Surface

  1. Step 1

    Once the concrete is cleaned and etched, it is ready for application of the bonding primer. Apply using a high-quality pump sprayer, 1/4 - 3/8" nap roller, nylon-polyester brush, or pad applicator.

  2. Step 2

    The bonding primer will dry to the touch in approximately 2 hours. Use the bonding primer when air and surface temperatures are between 50 - 90 degrees F.

    Once the surface has been primed, you can apply a topcoat. Make sure to apply after at least 4 hours but before 30 days.

Color Smart by Behr with orange living room in the background
建议的工具和物料
  • Bucket
  • Broom (Stiff Bristle)
  • Brush (2"-2½")
  • Bucket Grid
  • Chemical Resistant Gloves
  • Extension Pole
  • Hose
  • High Pressure Nozzle

  • Mop
  • Paint Can Opener
  • Paint Tray
  • Paint Tray Liner
  • Protective Apparel
  • Pump Sprayer
  • Rags
  • Roller Cover
  • Roller Frame
  • Stir Stick
更多专家建议
更多信息
Orange calculator icon in a white bubble
覆盖范围计算器

内部或外部; 面漆或底漆:看看让家里发生大变化需要花多少费用。

计算
A woman looking at several different color palettes
咨询专家

定制属于你的项目:让Behr技术专家出手,防止小皱纹成为大问题。

获取专家帮助