A great looking finish begins with the right start. Following the proper prep procedures will dramatically affect the look and longevity of your finished project.
最佳效果:
Before you start, make sure you wipe up any oil/grease spills and scrape and sweep away any dirt or loose contaminants.
New concrete must cure for 30 days before you can apply any floor treatment.
Step 1
Use a cleaner and etcher to properly prepare your surface. This product will clean your concrete surfaces and ensure penetration and adhesions of paints, stains and sealers.
Step 2
Use a plastic watering can to evenly distribute the cleaner and etcher product on your concrete surface.
Step 3
Spread the etcher on your surface using a stiff bristled, non-metal brush or broom. Allow the product to stand on your surface for at least 10-20 minutes. Then scrub vigorously using the broom.
Step 4
Thoroughly rinse the concrete surface with clean water using either a garden hose with a high-pressure nozzle or a pressure washer. Prevent all rinse solution from entering the storm drains.
Step 5
Allow the area to dry. To ensure the surface is clean of all residue, rub your fingers over the surface. If residue is visible on your fingers, repeat the rinsing step.
Step 1
Once the surface is cleaned and etched, it is ready for the bonding primer. Apply the bonding primer using a high-quality pump sprayer, 1/4 - 3/8" nap roller cover, a nylon-polyester brush, or pad applicator.
Step 2
Apply BEHR PREMIUM® Concrete & Masonry Bonding Primer to the surface. This product will enhance the adhesion of the topcoat to the surface.
Step 3
The bonding primer will dry to the touch in approximately 2 hours. Allow for longer dry times in cooler temperatures and higher humidity.
Apply a topcoat after at least 4 hours but before 30 days.
High Pressure Nozzle